![]() |
|
|
|
Public Works |
|
You are here: home : public works : roads and infrastructure |
||||||||||||||||||||
Public Works Links: Public Works Home |
Roads and Infrastructure :
|
|||||||||||||||||||
Contractors are required to obtain a Road Opening permit from the Township prior to cutting or excavating the road surface on any Township street. Permit applications must be filed in advance, and a 48-hour notice to the Public Works Department is required before excavating can begin. Failure to notify the Department prior to excavation may result in backfilling operations and/or pavement restoration to be rejected.
Fee Schedule For Road Opening Permits
For any opening over 500 square feet, or should the Township determine that the nature and/or duration of the opening requires that an inspector be present during the operation, the Permit Fees, Inspection Fees, and Restoration Deposit shall be dtermined by the Township Engineer and the Director of Public Works. |
||||||||||||||||||||
|
||||||||||||||||||||
None at this time.
| ||||||||||||||||||||
home : public works : solid waste and recycling |
Home / Administration / Clerk / Court / Construction / Emergency Services |
Copyright 2007, Township of Bordentown |