Redevelopment Plans
- Agway Yates Redevelopment Plan
- Southern Gateway Redevelopment Plan
- SAAJ-TAYLOR/RED ROOF INN Redevelopment Plan
- Block 1.01 Lots 3-9 and 20 Redevelopment Plan
-
Bordentown CrossRoads Redevelopment Plan:
History:
This plan was written for an area previously designated as an "area in need of rehabilitation" via Resolution 2018-295-15.
This plan was introduced via Ord #: O-2023-01 at the Township Committee Meeting on January 23, 2023 and was referred to the Planning Board for a master plan consistency review .
The Planning Board review the Plan at its regularly scheduled meeting on January 26, 2023 and found the plan to be consistent with the Township Master Plan via Resolution P-2023-07, which contained recommendations for the Township Committee to consider.
The Ordinance and subsequent Plan is scheduled for second reading and possible adoption at the February 13, 2023 Township Committee meeting.
Frequently Asked Questions Relating to Redevelopment and the Bordentown CrossRoads Redevelopment Plan:
Potential Areas in Need of Redevelopment:
Block 123.01 Lot 3: Feasibility Study for a potential non-condemnation redevelopment area
Township Committee Resolution #2023-113 authorizing the Township Planning Board to undertake a preliminary investigation as to whether the proposed study area can be designated as an area in need of redevelopment (non-condemnation) in accordance with the Local Redevelopment and Housing Law (NJSA40A:12A-1 et seq.)
September 28, 2023: Planning Board will hold a public hearing to determine if the the proposed study area meets the standards to be delineated as a non-condemnation redevelopment area. The purpose of the hearing is to hear persons who are interested in or would be affected by a determination that the delineated area is a redevelopment area. Meeting will be held at 1 Municipal Drive, Bordentown, NJ in the Municipal court chambers at 7 PM.